My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - One-Way to Two-Way Conversion Construction Inspection - Lochmueller Group
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Agreements, Contracts, Proposals, and Addenda
>
Amendment to PSA - One-Way to Two-Way Conversion Construction Inspection - Lochmueller Group
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 11:59:20 AM
Creation date
8/30/2016 10:42:22 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
8/23/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Owner: Engineer: <br />City of South Bend, Indiana Lochmueller Group, Inc. <br />Board of Public Works <br />Title: Gary A. Gilot, President Title: Susan D. AI -Abbas, Branch Manager, Associate <br />By: <br />— <br />Title: � n�De'r <br />David P. Relos, a br <br />By: <br />Title: James A. Mueller, Member <br />By: <br />Title: Elizabeth A. Maradik, Member <br />By: <br />Title: Therese J. Dora , Mellnber <br />Attest: <br />Title: LTKdMartin, Clerk <br />Date: Date: <br />Page 3 <br />(Exhibit K—Amendment to Owner -Engineer Agreement) —Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright 0 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.