My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
04/03/00 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2000
>
04/03/00 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:07:40 PM
Creation date
8/25/2016 1:23:03 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
4/3/2000
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGUI,)ULMEETING <br />WARNER AND SONS <br />12875 McKinley Highway <br />Mishawaka, Indiana 46545 <br />Bid was signed by Mr. Mark Weaver <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $549,790.00 <br />APRIL 3.2000 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above bids were referred <br />to the Division of Engineering for review and recommendation. <br />OPENING OF BIDS ENTERPRISE DRIVE EXTENSION (LONE WOLF DRIVE AND EAGLE <br />WAY= PROJECT NO. 100-016 <br />This was the date set for receiving and opening of sealed bids for the above referred to project. The <br />Clerk tendered proofs of publication ofNotice in the South Bend Tribune and the Tri-County News <br />which were found to be sufficient. The following bids were opened and publicly read: <br />RIETH RILEY CONSTRUCTION COMPANY INC <br />25200 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by Mr. Christopher Weinkauf, Sales Manager <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $487,114.00 <br />OSELKA CONSTRUCTION COMPANY <br />Post Office Box 254 <br />Pier, Michigan 49129 <br />Bid was signed by Mr. Leslie Badgley, President <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $468,801.15 <br />HRP CONSTRUCTION. INC. <br />Post Office Box 266 <br />South Bend, Indiana 46628 <br />Bid was signed by Mr. Paul Fallon <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: $505,644.97 <br />YOUNG'S EXCAVATING, INC. <br />Post Office Box 2766 <br />South Bend, Indiana 46680 <br />1 <br />1 <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.