28.
<br />HMA Intermediate, 19.5 mm
<br />645
<br />TON
<br />$ 55.00
<br />$ 35,475.00
<br />29.
<br />HMA Base, 25.0 mm
<br />1930
<br />TON
<br />$ 45.00
<br />$ 86,850.00
<br />30.
<br />HMA for Sidewalk
<br />14
<br />TON
<br />$ 125.00
<br />$ 1,750.00
<br />31.
<br />Curb Ramp, Concrete
<br />19
<br />SYS
<br />$ 125.00
<br />$ 2,375.00
<br />32.
<br />Curb and Gutter, Combined
<br />3320
<br />LF
<br />$ 16.00
<br />$ 53,120.00
<br />33.
<br />PCCP For Approaches, 8"
<br />390
<br />SYS
<br />$ 65.00
<br />$ 25,350.00
<br />34
<br />Mobilization and Demobilization for
<br />Seeding
<br />1
<br />EA
<br />$ 475.00
<br />$ 475.00
<br />35.
<br />Seeding and Topsoil
<br />5100
<br />SYS
<br />$ 4.00
<br />$ 20,400.00
<br />36.
<br />Storm Sewer Pipe 12"
<br />810
<br />LF
<br />$ 17.00
<br />$ 13,770.00
<br />37•
<br />Storm Sewer Pipe 15"
<br />350
<br />LF
<br />$ 19.00
<br />$ 6,650.00
<br />38.
<br />Storm Sewer Pipe 18"
<br />250
<br />LF
<br />$ 23.00
<br />$ 5,750.00
<br />39.
<br />Storm Sewer Pipe 24"
<br />82
<br />LF
<br />$ 35.00
<br />$ 2,870.00
<br />40.
<br />Sanitary Sewer, PVC SDR 35, 8 IN
<br />166
<br />LF
<br />$ 37.00
<br />$ 6,142.00
<br />41.
<br />Sanitary Sewer, PVC SDR 35, 10 IN
<br />1606
<br />LF
<br />$ 42.00
<br />$ 67,452.00
<br />42.
<br />Sanitary Manhole
<br />5
<br />EA
<br />$ 4,800.00
<br />$ 24,000.00
<br />43.
<br />Catch Basin K10
<br />7
<br />EA
<br />$ 3,200.00
<br />$ 22,400.00
<br />44•
<br />Manhole C15
<br />3
<br />EA
<br />$ 4,100.00
<br />$ 12,300.00
<br />45.
<br />Riprap Stone
<br />60
<br />TON
<br />$ 45.00
<br />$ 2,700.00
<br />46.
<br />Safety Metal End Section, Type 3, 24 IN
<br />1
<br />EA
<br />$ 1,250.00
<br />$ 1,250.00
<br />47•
<br />Geotextile Fabric
<br />60
<br />SYS
<br />$ 1.00
<br />$ 60.00
<br />48.
<br />Irrigation Repair
<br />260
<br />SYS
<br />$ 5.00
<br />$ 1,300.00
<br />49
<br />Sign Post, Square, Type 2, Reinforced
<br />Anchor Base
<br />19
<br />LF
<br />$ 15.00
<br />$ 285.00
<br />50.
<br />Sign, Sheet With Legend 0.080 IN
<br />6.3
<br />SFT
<br />$ 20.00
<br />$ 126.00
<br />51,
<br />Sign, Sheet With Legend 0.100 IN
<br />18
<br />SFT
<br />$ 50.00
<br />$ 900.00
<br />52.
<br />Sign, Sheet With Legend 0.125 IN
<br />7.5
<br />SFT
<br />$ 30.00
<br />$ 225.00
<br />53.
<br />Handhole, Lighting
<br />1
<br />EA
<br />$ 800.00
<br />$ 800.00
<br />54.
<br />No. 4 Wire
<br />565
<br />LF
<br />$ 6.00
<br />$ 3,390.00
<br />55.
<br />Conduit, PVC, Schedule 80, 2 IN.
<br />555
<br />LF
<br />$ 4.00
<br />$ 2,220.00
<br />56.
<br />Miscellaneous Equipment for Lighting
<br />1
<br />LS
<br />$ 500.00
<br />$ 500.00
<br />57.
<br />Light Pole Assembly
<br />1
<br />EA
<br />$ 3,000.00
<br />$ 3,000.00
<br />58.
<br />Light Pole Foundation
<br />2
<br />EA
<br />$ 700.00
<br />$ 1,400.00
<br />5.
<br />Line, Remove
<br />640
<br />LF
<br />$ 0.90
<br />$ 576.00
<br />60.
<br />Transverse Marking, Liquid Thermoplastic
<br />Traffic Paint, Crosswalk, 6 IN
<br />100
<br />LF
<br />$ 1.45
<br />$ 145.00
<br />Version 7/31/2015 Contractor's Bid for Public Works - 8