Laserfiche WebLink
1. REVISE: Should Alternate B be awarded, Alternate B will have a final completion date <br />fefty five (4 5) of <br />12/09/2016. <br />2.2 SPECIAL PROVISIONS, Page 9, Section XXI.B.4, Pre -Construction Video of Site <br />Conditions: <br />ADD: The approximate linear footage required to be video recorded is five thousand fifty <br />(5,050) feet, This includes the existing inlets on Dylan Drive, the length of land between <br />Dylan Drive and Mayflower Road where the new road and water main will be located, <br />the area in which the brick pavers are being removed, and the intersection of Ameritech <br />Drive and Cleveland Road. This number is an approximation and as such, it shall be the <br />responsibility of the contractor to field verify the actual lineal footage of recording <br />required. <br />2.3 SPECIAL PROVISIONS, Page 38, Section LXIX.B.5, Wire: <br />I. ADD: This item shall include the cost of the four (4) conductors within the No. 4 wire. <br />PART 3 — CONSTRUCTION DOCUMENTS <br />3.1 Plan Sheets 12-16 —Plan and Profile <br />1. ADD note regarding the project location being outside of the FEMA floodplain. <br />2. REVISE location of the water main. Shifted three (3) feet away from the curb line. <br />3.2 Plan Sheet 24 — S WPPP Cover Sheet <br />1. REVISE General Note 2 to reflect the updated contact information for the SWCD office. <br />ATTACHMENTS <br />• Pre -Bid Meeting Sign In Sheet <br />• Revised Plan Sheets <br />END OF ADDENDUM #1 <br />T\ <br />ignature ate <br />Chet Waggoner Court (116-005) Addendum # 1 <br />August 12, 2016 Page 12 <br />