Laserfiche WebLink
REGULAR MEETING <br />Quotation was submitted by Mr. Rocky Geans <br />QUOTATION: $31,892.00 <br />KASER SPRAKER CONSTRUCTION INC <br />25487 West State Road 2 <br />South Bend, Indiana 46619 <br />Quotation was submitted by Mr. Gary Spraker <br />QUOTATION: $44,207.00 <br />SELGE CONSTRUCTION COMPANY INC <br />2833 South 1 lth Street <br />Niles, Michigan 49120 <br />Quotation was submitted by Mr. John Szuba <br />QUOTATION: $31,274.00 <br />MCINTYRE-JONES CONSTRUCTION, LLC <br />2526 West 61h Street <br />Mishawaka, Indiana <br />Quotation was submitted by Mr. Jeffrey Bradley <br />QUOTATION: $29,115.46 <br />RIETH RILEY CONSTRUCTION COMPANY INC. <br />Post Office Box 1775 <br />South Bend, Indiana 46634 <br />Quotation was submitted by Mr. Mark Nagle <br />QUOTATION: $27,092.75 <br />APRIL 8, 2002 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above Quotations were <br />referred to the Division of Engineering for review and recommendation. After reviewing those bids, <br />Mr. David Koppana, Engineering, recommends that the Board award the contract to Rieth Riley <br />Construction in the amount of $27,092.75. <br />Therefore, Mr. Inks made a motion that the recommendation be accepted and the bid be awarded as <br />outlined above. Mr. Gilot seconded the motion which carried. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS TJX SITE <br />GRADING AND DRAINAGE PROJECT - PROJECT NO. 102-034A <br />In a memorandum to the Board, Mr. Jason Durr, Engineering, requested permission to advertise for <br />the receipt of bids for the above referred to project. Therefore, upon a motion made by Mr. Gilot, <br />seconded by Mr. Inks and carried, the request to advertise for the receipt of bids was approved. <br />APPROVAL OF REQUEST TO ADVERTISE FOR THE RECEIPT OF BIDS TJX SITE <br />SANITARY SEWER RELOCATION PROJECT - PROJECT NO. 102-34B <br />In a memorandum to the Board, Mr. Jason Durr, Engineering, requested permission to advertise for <br />the receipt of bids for the above referred to project. Therefore, upon a motion made by Mr. Gilot, <br />seconded by Mr. Inks and carried, the request to advertise for the receipt of bids was approved. <br />APPROVAL OF AGREEMENT - CONTINGENT ATTORNEY FEE FOR CODE <br />ENFORCEMENT <br />Mr. Gilot stated that the Board is in receipt of an Agreement between the City of South Bend and <br />1 <br />1 <br />I <br />