My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
03/24/03 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2003
>
03/24/03 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:04:11 PM
Creation date
8/16/2016 2:35:53 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
3/24/2003
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
0085 <br />1 <br />REGULAR MEETING <br />RIETH-RILEY CONSTRUCTION COMPANY, INC. <br />Post office Box 1775 <br />South Bend, Indiana 46634 <br />Bid was signed by Mr. Christopher Weinkauf <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />BID: <br />Subtotal Page 1 <br />Subtotal Page 2 <br />Subtotal Page 3 <br />Total Bid: <br />$1,281,539.50 <br />$ 152,903.50 <br />$ 23,217.50 <br />$1,457,660.50 <br />WALSH CONSTRUCTION COMPANY OF ILLINOIS <br />2749 North State Road 39 <br />LaPorte, Indiana 46350 <br />Bid was signed by Mr. Jeffery Dunifon <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />:= <br />Subtotal Page 1 <br />Subtotal Page 2 <br />Subtotal Page 3 <br />Total Bid <br />$1,331,842.00 <br />$ 220,760.00 <br />$ 34,327.00 <br />$1,586,929.00 <br />MARCH 24, 2003 <br />KANKAKEE VALLEY CONSTRUCTION COMPANY, INC. <br />Post Office Box 1471 <br />LaPorte, Indiana 46352 <br />Bid was signed by Mr. James Nelson <br />Non -Collusion Affidavit was in order <br />Non -Discrimination Commitment form was completed <br />Five per cent (5%) Bid Bond was submitted <br />:10 <br />Subtotal Page 1 <br />Subtotal Page 2 <br />Subtotal Page 3 <br />$1,400,529.09 <br />$ 220,829.70 <br />$ 29,688.00 <br />Total Bid: $1,651,046.75 <br />Upon a motion made by Mr. Gilot, seconded by Mr. Littrell and carried, the above bids were referred <br />to the Division of Engineering for review and recommendation. <br />OPENING OF BIDS - ONE (1) MORE OR LESS, 2003 MEDIUM DUTY CHASSIS - FIRE <br />DEPARTMENT <br />This was the date set for receiving and opening of sealed bids for the above referred to equipment. <br />The Clerk tendered proofs of publication of Notice in the South Bend Tribune and the Tri-County <br />News which were found to be sufficient. The following bid was opened and publicly read: <br />
The URL can be used to link to this page
Your browser does not support the video tag.