Laserfiche WebLink
a 31 <br />REGULAR MEETING <br />JULY I1.2005 <br />Bid was signed by: Mr. William Loudin <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $191,300.00 <br />Item 2: $5,000.00 <br />Item 3: $1,300.00 <br />Item 4: $50,000.00 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the bids were <br />referred to the Division of Engineering for review and recommendation. <br />OPENING OF BIDS — UNITED DRIVE RELOCATION — PROJECT NO. 103-076 <br />COIT <br />This was the date set for receiving and opening of sealed bids for the above referred to <br />project. The Clerk tendered proofs of publication of Notice in the South Bend Tribune <br />and the Tri-County News, which were found to be sufficient. The following bids were <br />opened and publicly read: <br />WALSH & KELLY, INC. <br />24358 State Road 23 <br />South Bend, Indiana 46614 <br />Bid was signed by: Mr. Kevin Kelly <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Total Project Bid <br />103-076 103-076a Total Contract <br />Base Bid <br />$806,990.58 $149,065.95 $956,056.53 <br />Alternate A <br />103-076 Bid 103-076a <br />$5,000.00 $0.00 <br />SELGE CONSTRUCTION COMPANY INC. <br />2833 South 111Street <br />Niles, Michigan 49120 <br />Bid was signed by: Mr. John Szuba <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: <br />Total Project Bid <br />103-076 103-076a Total Contract <br />Base Bid <br />$800,153.23 $152,958.15 $953,111.38 <br />Alternate A <br />103-076 Bid 103-076a <br />$10,000.00 $0.00 <br />