My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/27/2005 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
2005
>
06/27/2005 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/15/2024 2:06:44 PM
Creation date
8/16/2016 10:56:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
6/27/2005
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
REGULAR MEETING JUNE 27, 2005 <br />�r'd15 <br />After reviewing those quotations, ,Mr. Jason Durr, Engineering, recommends that the <br />Board award the contract to the lowest, responsible and responsive bidder, Ram <br />Construction, 1957 Denslow Drive, South Bend, Indiana, in the amount of $32,624.67. <br />Therefore, Mr. Inks made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Mr. Littrell seconded the motion, which carried. <br />OPENING OF QUOTATIONS/AWARD QUOTATION — PORTAGE AVENUE <br />IMPROVEMENTS — ALLEN/HUMBOLDT — PROJECT NO. 105-023A (COIT) <br />Mr. Gilot advised that this was the date set for the receiving and opening of sealed <br />Quotations for the above referred to project. The following Quotations were opened and <br />read: <br />RAM CONSTRUCTION <br />1957 Denslow Drive <br />South Bend, Indiana 46614 <br />Quotation was submitted by Mr. Juan Ramirez <br />QUOTATION: $27,381.00 <br />RIETH-RILEY CONSTRUCTION COMPANY, INC. <br />Post Office Box 1775 <br />South Bend, Indiana 46634 <br />Quotation was submitted by Mr. David Dudash <br />QUOTATION: $40,062.50 <br />MCINTYRE JONES, INC. <br />2522 West Sixth Street <br />Mishawaka, Indiana 46544 <br />Quotation was submitted by Mr. Jeffery Bradley <br />QUOTATION: $40,197.80 <br />SELGE CONSTRUCTION <br />2833 South 1l1Street <br />Niles, Michigan 49120 <br />Quotation was submitted by Mr. John Szuba <br />QUOTATION: $44,945.00 <br />WALSH & KELLY, INC. <br />24358 State Road 23 <br />South Bend, Indiana 46614 <br />Quotation was submitted by Mr. Kevin Kelly <br />QUOTATION: $41,207.50 <br />It was noted that the Quotation of Walsh & Kelly, Inc., should not be considered, as they <br />had not attended the mandatory pre -bid conference. <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks and carried, the above <br />Quotations were referred to the Division of Engineering for review and recommendation. <br />After reviewing those quotations, Mr. Jason Durr, Engineering, recommends that the <br />Board award the contract to the lowest, responsible and responsive bidder, Ram <br />Construction, 1957 Denslow Drive, South Bend, Indiana, in the amount of $27,381.00. <br />Therefore, Mr. Inks made a motion that the recommendation be accepted and the <br />quotation be awarded as outlined above. Mr. Littrell seconded the motion, which carried <br />
The URL can be used to link to this page
Your browser does not support the video tag.