Laserfiche WebLink
rA11M U 10 <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $79,029.75 <br />RAM CONSTRUCTION, INC. <br />1957 Denslow Drive <br />South Bend, Indiana 46614 <br />Bid was signed by: Mr. Juan Ramirez, Jr. <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $86,432.77 <br />SELGE CONSTRUCTION COMPANY INC. <br />2833 South 111Street <br />Niles, Michigan 49120 <br />Bid was signed by: Mr. John Szuba <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $87,440.00 <br />MCINTYRE JONES INC. <br />2522 West 6 th Street <br />Mishawaka, Indiana 46544 <br />Bid was signed by: Mr. Jeffrey Bradley <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />BID: $91,342.88 <br />L.L. GEANS CONSTRUCTION COMPANY <br />1923 North Home Street <br />Mishawaka, Indiana 46545 <br />Bid was signed by: Mr. Mike Glenn <br />Non -Collusion Affidavit was in order <br />Non -Discrimination commitment form was completed <br />Five percent (5%) Bid Bond was submitted <br />APRIL 11, 2005 <br />BID: $125,180.00 <br />Upon a motion made by Mr. Littrell, seconded by Mr. Inks, and carried, the above bids <br />were referred to the Division of Engineering for review and recommendation. After <br />reviewing those bids, Mr. Jason Durr, Engineering, recommends that the Board award the <br />contract to the lowest, responsive and responsible bidder, Walsh and Kelly, in the amount <br />of $75,178.75. Therefore, Mr. Gilot made a motion that the recommendation be accepted <br />and the bid be awarded as outlined above. Mr. Inks seconded the motion, which carried. <br />