Laserfiche WebLink
Project No. 116-001 <br />Change Order No.18 - <br />07/19/16 <br />The following special provisions have been amended or added to the Contract Documents and are issued as <br />a part of this Change Order: <br />(None.) <br />DRAWINGS: <br />The following sheets have been revised and are issued as new sheets as a part of this Change Order: <br />(None.) <br />END OF CHANGE ORDER NO. 18 <br />CITY OF SOUTH BEND <br />' C <br />erwcv. <br />PROJECT NAME: One -Way to Two -Way Street Conversion — Division A Rtr3 <br />PROJECT NUMBER: 116-001 <br />Division B: <br />k <br />Description <br />CRETE, CURB, INTEGRAL, TYPE B <br />Quantity <br />352 <br />Unit <br />LFT <br />Unit Price <br />$27.00 <br />Total Amount <br />$9,504.00 <br />GRAL CONCRETE CURB <br />1852 <br />LS <br />$26.00 <br />$48,152.00 <br />, CONCRETE, REMOVE <br />2252 <br />LFT <br />$7.00 <br />$15,764.00 <br />MENT REMOVAL <br />-250 <br />SYS <br />$10.00 <br />-$2,500.00 <br />OWNER: City of South Bend <br />Signature <br />$70,920.00 <br />CONTRACTOR: Rieth-Riley Construction <br />Signature <br />