My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No. 4 - SB One-Way to Two-Way Conversion Div A Proj No. 116-001 Rieth-Riley
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2016
>
Change Orders
>
Change Order No. 4 - SB One-Way to Two-Way Conversion Div A Proj No. 116-001 Rieth-Riley
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/28/2025 1:52:07 PM
Creation date
8/11/2016 1:46:49 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
8/9/2016
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order No. 05 <br />One- Way to Two -Way Street Conversion <br />Division A & B <br />Project No. 116-001 <br />OWNER: City of South Bend <br />ENGINEER: American Structurepoint, Inc. <br />Patrick K. Wooden, P.E. <br />Professional Engineer No. 10504741 <br />CONTRACTOR: Rieth-Riley Construction <br />PROJECT: South Bend One -Way to Two -Way Street Conversion, Division B <br />Project No. 116-001 <br />SUBJECT: Concrete Pavement Joint Revision <br />ISSUE DATE: July 18, 2016 <br />This Change Order to the Contract document shall supplement, amend, and shall become a part of, <br />and be incorporated as an Addendum to the Contract. <br />The following is a summary and description of the revisions to the Contract by this Change Order: <br />1. Revise PCCP joints from the two saw cut method with backer rod to the two saw cut <br />method with no backer rod using Hot Pour 3405 per the 503 section of the spec book. <br />Work to be performed per the attached revised standard specifications. <br />Per INDOT Standard Specifications Section 105.11, "Unacceptable work, whether the result of poor <br />workmanship, use of defective materials, damage through carelessness, or any other cause found to <br />exist prior to the final acceptance of the work, shall be removed immediately and replaced in an <br />acceptable manner". <br />The following sections of the Contract Documents are revised as a result of the above changes: <br />1. Bid/Proposal Form: <br />Division A: <br />Add 5,000 LFT to Line Item EWA 245: JOINT SEALANT W/O BACKER ROD, 5,000 LFT @ <br />$00.68/LFT for a total addition of $3,400,00 <br />Division B: <br />Add 15,000 LFT to Line Item EWA 463: JOINT SEALANT W/O BACKER ROD, 15,000 LFT @ <br />$00.68/LFT for a total addition of $10,200.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.