Laserfiche WebLink
5(7171I1g <br />F. 2 <br />BID/PROPOSAL m <br />CITY OF SOUTH BEND r a <br />1865 <br />Project Name CEO SUITES -SUITE 17 REMODEL <br />Project No. 116-010 <br />For Bids Due June 28, 2016 <br />BASE BID <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Total <br />Amount <br />Furnish all labor, services, materials, insurance and equipment for the CEO <br />1 <br />Suite Remodel as described in Special Provisions -Project Description and <br />1 <br />Lump <br />$38,503.00 <br />Drawings Sheets D1; A-1, A-2, A-3. <br />Sum <br />Furnish all labor, services, materials, insurance and equipment for the Suite 17 <br />2 <br />Remodel as described in Special Provisions -Project Description and Drawings <br />1 <br />Sump <br />$77,027.00 <br />Sheets D1; A-1, A-2, A-3. <br />TOTAL OF ITEM 1 AND ITEM 2 1 <br />$115,530.00 <br />ALTERNATE #1 <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Total <br />Amount <br />CEO SUITE - Rework and expand Lounge No.202 and Toilet Room No.206. <br />Lump <br />$19mount0 <br />1 <br />Work includes, but is not limited to, demolition, general construction, plumbing <br />1 <br />I <br />and electrical as detailed on Drawing Sheets D1, A5, M1, P1, E2. <br />Sum <br />ADD <br />ALTERNATE #2 <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Total <br />Amount <br />CEO SUITE - Renovate existing Storage Room No.205 and Storage Room <br />1 <br />No.208 into Wet Bar/Closet No.205. Work includes, but is not limited to, <br />Lump <br />demolition, general construction, plumbing and electrical as detailed on <br />1 <br />Sum <br />$15,526.00 <br />Drawing Sheets D1, A5, M1, P1, E2. <br />ALTERNATE #3 <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Total <br />Amount <br />CEO SUITE - Add new exterior window in Conference Room No.207. Work <br />1 <br />includes, but is not limited to, selective demolition, structural and general <br />1 <br />$7,892.00 <br />construction as detailed on Drawing Sheets D1, A5. <br />Sump <br />ALTERNATE#4 <br />Item <br />No. <br />Description <br />P <br />Quantity <br />Unit <br />Total <br />Amount <br />1 <br />CEO SUITE - Add carpet (CPT-1) to Ticket Office 200 as detailed on Drawing <br />1 <br />Lump <br />$1, ;50.00 <br />Sheets D1, A5. <br />Sum <br />ALTERNATE #5 <br />Item <br />No, <br />Description <br />p <br />Quantity <br />Unit <br />Total <br />Amount <br />1 <br />SUITE 17 - Add Hall No. 102 and Toilet Room No. 103 as detailed on Drawing <br />p <br />Sheets D1, A4, M1, P1, E2. <br />1 <br />Sum <br />$53,847.00 <br />Version 7/31/2015 Contractor's Bid for Public Works - 7 <br />